Restoration and structural consolidation of a historic building

Ex Ridotto, Mazzorbetto Island (Venice)

The intervention in brief

In 2023, on the island of Mazzorbetto, we tackled the restoration of the Ex Ridotto, a historic palazzetto characterised by its fine late Gothic-Venetian forometry overlooking the Mazzorbo canal. The work included:
• Clearance of surrounding vegetation to facilitate work
• Securing of facades and demolition of superfetations
• Reconstruction of wall continuity at cracks and marked deterioration
• Removal of old flooring and floor consolidation
• Verification of existing tie rods and installation of new steel ones
• Renovation of the roof covering
• Consolidation, integration and cleaning of stone elements
• Scaling and resurfacing of external washed earthenware plastering

Architect Diana Zabarella was responsible for the design and construction management, ensuring a result that respects the historicity and functionality of the building.

Type
Historical building
Intervention
Complete renovation
Place
Isola di Mazzorbetto, Venice
Mazzorbetto
Architectural Design and Works Management
Photography
CONDIVIDI IL PROGETTO
P1050048
P1070774
P1050045
P1070785_inPixio
P1040909
IMG_6320
P1040887
IMG_6265
P1070764_inPixio
_DSC0008
P1070777_inPixio
P1080209
IMG_6260
IMG_6261
IMG_6270
IMG_6276
IMG_6301
IMG_6309
IMG_6329

Complete Restoration of the Ex Ridotto on the Island of Mazzorbetto

In 2023, we undertook the restoration of the Ex Ridotto, located on the island of Mazzorbetto, one of the most fascinating locations in the Venice lagoon. This historic building, overlooking the Mazzorbo canal, required a complex intervention due to its isolated location and the logistical challenges of transporting materials and resources from Venice and Cavallino-Treporti. We began by clearing the vegetation and sanitising the surrounding building to allow the site to be set up, guaranteeing the safety of the workers and facilitating the handling of materials; scaffolding was then installed. The building, despite the pronounced signs of time and the long period of neglect, presented a generally solid structure that was preserved and enhanced during all phases of the restoration. Our intervention began with the verification of the primary and secondary wooden structure of the roof, the restoration of the planking and the rebuilding of the roofing package with the insertion of B.V. and insulation with the installation of new gutters in order to protect the building from the weather. The façades were then secured, the superfetations demolished and the composition of the elevations rearranged. The work continued with the consolidation of the load-bearing masonry, restoring the masonry continuity in correspondence of the cracks and areas of marked deterioration, checking the existing tie-rods and installing new steel ones. Following the partial removal of the old floorings and subfloors, the beams were checked by resurfacing the deteriorated heads and then consolidating the original wooden floor using planks glued with resins and nailed with nailing bars. The intervention was completed with the restoration - consolidation, integration and cleaning - of the stone elements and the rebuilding of the external plaster in traditional washed earthenware, restoring the building to its original appearance. This project represents a combination of modern technology and respect for the building's history, fitting harmoniously into the unique context of the Venetian lagoon. The direction and design of the works were entrusted to architect Diana Zabarella, who ensured a restoration executed with extreme care and attention to detail.
Contacts

Contact us to receive information or request a quote

Fill in the contact form to get more information or receive a quote. Leave us your contact details and a brief description of your request: we will get back to you as soon as possible!